Drilling Supervisor of 25 years contracted with major operators, Shell, Occidental, PDO

Diversified Superintendent & Supervisor experience with Drilling, Completion, Workovers, P&A, MPD, HPHT, Offshore, and Onshore wells.

I am very committed, responsible educated with Master Petroleum Engineering degree, international exposure worked in 4 different countries, excellent references from Mangers available,

Education
June 1990 . May 1996
Univeristy of Alberta Petroleum Engineering

GPA 3.91

Experience
November 2018 to June 2021
Halliburton Drilling / Completion Supervisor

• Delivered strong operational leadership skills to ensure all HSSE regulations were followed
• Tasked with leading my team 2 x Drilling & Completion Jr. Engineers & 2 Night Drilling Supervisors
• Successfully drilled & completed 5 x Hz wells (~4200 m TD) with challenging wellbore mechanical issues
• Responsible & succeeded in delivering 5 x 3500 m Hz exploration wells Drill & Completion campaign in challenging well conditions
• Teaching and competency management of stuck-pipe prevention to drilling contractor leaders
• Drilling engineering support to clients: BHA designs, hydraulics, torque and drag modeling
• Improving Drilling performance through stuck-pipe reduction, hole cleaning, downhole vibration BHA/bit optimization
• Wrote & designed all drilling programs and associated time/cost estimates that are technically optimized, feasible, and realistic.
• Responsible for all D&C risks have been identified and tangible mitigation plans are in place and documented.
• Ensured all equipment, materials, services are in place for timely good execution.
• Ensured that well and/or hole sections take place and that matching approved Work Instructions are issued to the drilling crews.
• Ensured Management of Change (MOC) procedure is followed for any changes to approved Drilling Programs or Work Instructions.
• Setting examples and always active in all HSE practices
• Managed KPI’s and key metrics for each well, reported regularly progress and projections against these key metrics,
• Ensure compliance with policies, procedures, and guidelines assigned drilling rig.

February 2016 to Feb 2018
BGFCL Sr. Completion / Work-Over Engineer

 Responsible for Work-Over rig tenders, Planning, and contractual
 Prepare technical and commercial tender bids for service contracts.
 Responsible to manage & successfully completing 7 x Work Over and Completion wells.
 Tasked with leading a team of 3 Jr. Drilling Engineers
 Following NORSOK Standards D-001, Rev 3, Well Intervention D-002 (2020), Well Testing, Clean up and Flow back D-007 (2021)
 Present technical proposals on modification requests respecting cost, safety, and operability.
 Follow up project billing, cost estimating, control, and verification of invoices for billing.
 Attend pre-tender meetings and site visits.
 Preparing requisition, purchase orders, and contract strategies for materials and procurement contracts.
 Develop scope of work, cost estimate, and technical appraisal for service contracts
 Co-operate with the project manager to ensure that project is completed as at when due and meet their set targets.
 Implement online bidding of contracts using Ariba and NipeX portals
 As a Project Lead Engineer responsible for 4 x gas well-complexed completions, 2 Workovers & re-completions)
 Reported directly to Project Director
 Responsible for horizontal and vertical well-completion designs and operations
 Contribute and work effectively in a multidiscipline, multi-work center team environment where the overall success of the project is paramount.
 Compiled all data & reviewed all project ITRs to ensure that they met project specifications and were aligned with the Completion Management System database
 Developed the initial completion designs that resulted in the first 4 wells averaging 34 MMscfe/d initial production rates
 Liaised with construction and QC inspection personnel to discuss any ITR exceptions and were compliant with project specifications
 Completed all data downloads & updated the completions management database ensured content was in line with project change control procedures and verified data quality on completion of import
 Played key role of the work preparation team to execute the completions certification preparation activities. Reviewed engineering, construction, and commission documentation of the project. Schedule work activities in line with the completion’s execution plan
 Wrote and designed completion programs for BGFCL (4 gas well-complexed completions, 2 Workovers & re-completions)
 Achieved overall project management and coordination of all multi-disciplinary team
 Prepared completion and work-over deliverables, gate & peer reviews ensuring compliance with Well Delivery process
 Contributed to cost transformation, reducing planned Work-Over well cost by 30%, by implementing simplified work-over design, new technology and using existing inventory & no nonstandard equipment.
 Led all tendering for all completion & related equipment both technical & contractual
 Wrote & deigned all Cement plugs, Bridge plug’s, lower & Upper completion programs
 Tasked with overseeing all Nitrogen kick off operations were safely executed
 Tasked with ensuring all completion & BHA components were delivered and in running condition
 Tasked with writing and approving all Completion &WI Operations
 Achieved with orchestrating & managing all XT’s are properly & successfully aligned with BPV is properly set and pressure test to API specifications
 Oversaw all envelope testing was conducted properly to ensure all barriers are in place

July 2013 to Feb 2016
Brunei Shell Petroleum Drilling Supervisor Offshore

● Tasked with leading my team of 2 x drilling engineers to safely drill HPHT wells utilizing MPD and Mudline Suspension Systems
● Achieved with orchestrating & managing to successfully land off all complex completion designs (SMART and ESTMZ) which included Gravel packing, brine filtration, calculating BHA components space out’s
● Tasked with writing DSI’s, Drilling, Completion &WI’s, Work Over & PA’s decommissioning programs
● Due to platform weight limitations, the operation was required to use a Mud Suspension / MLS tieback system
● Some of the challenges utilizing the Drill-Quip MS 15 (15 k psi)
 Was difficult to use UNIHEAD-type wellheads, due to the space out WH – MLSS (although, we managed to complete the run)
 MLSS imposed additional internal ID restrictions due to the landing profiles for the ML hangers, which we found reduced the traditional contingency casing strings.
 Created a tight tolerance situation (ID), to run liner hangers and some packers, bridge plugs and cement retainers, we ran a gauge ring prior to running the LH tools
 Comparison costs were within range of each other however we were forced to use a company that could deliver in a timely manner
 Because of time constraints we had NPT because MLSS assemblies offline prior to RIH. In the future MLSS be included in the planning stages and assembled in the workshop
 Mandated to land the conductor (with MLSS buttweld sub) to be set at the right depth
 following casing strings must land on the MLSS, so leaving a casing off bottom would be problematic – Rat hole was minimal due to geological depths
 Delivery times for MLSS was very tight because well was not planned for the MLSS
● Tasked with ensuring all updated directional programs are being followed
● Tasked with ensuring all updated directional programs are being followed
● Achieved all Tubing conveyed perforations (TCP), Pipe conveyed Logging (PCL) operations successfully
● Achieved all Jack-up batch drilling operations, which included overseeing well tie-ins and Nitrogen lifts (Kick off) all successful
● Being involved with all risk management meetings decisions.
● Achieved with orchestrating & managing to successfully P&A’s & XT’s decommissioning operations
● Coached & Mentored Junior DSV to later achieve Sr. DSV roles
● Achieved acknowledgments from managers on a job well done based on the KPI’s & improved performances

August 2011 to April 2013
Dragon Oil Workover & Completion Superintendent

● Tasked with writing all Well Intervention & Work-Over programs
● Tasked with leading a team of 2 x Drilling / Work-over Engineers
● Responsible for all HWU operations – writing HSE & Operational programs – ensuring the platform weight does not exceed maximum carry weight
● Orchestrated & managed all the above programs on 40-year-old platforms which were very challenging and were achieved
● Ensured proper depth measurements by checking measurements, calculations, and adjustments.
● Designed specifications for drilling plans procedures and problem mitigation for each hole section to ensure efficient drilling.
● Designed wells and monitored the drilling / Work-Over operations on site.
● Administered drilling and service contracts.

November 2007 to July 2011
Occidental Oman Drilling Superintendent

● Tasked with leading my team 5 x Drilling & Completion Engineers & 8 x Sr. Drilling Supervisors
● Responsible for overseeing 5 x drilling operations, which include 4 Hz drilling (ERD) & 1 x High Angle Directional (230°/30) & Exploration Drilling project 20% H2S working within EPZ area.
● Tasked with approving all D&C programs while maintaining an approved annual budget of 85M.
● Mentored drilling engineers on programs and procedures and collaborated with Engineering on KPI and BDP to improve operational performance.
● Delivered strong operational leadership to staff in the execution of day-to-day operations and ensured compliance with all HSE policies
● Demonstrated technical proficiency by facilitating the drilling of Hz wells of up to 4200 in the blocks 41 & 39 in the Oman area
● Tasked with leading an engineering team to utilize SOBM in all intermediate hole sections on all drilling projects in Oman remote desert operations
● Planned, developed, evaluated, scheduled, executed & supervised all the tasks necessary to process pre-tendering & tendering of all Drilling rig and Work-Over rigs
● Administered and monitored all service contracts and materials/equipment call-off agreements after award to ensure the smooth running of Drilling & Workover units by working closely
● Managed plans and work schedules for D&C activities.
● Conducted regular rig-site visits for HSE inspections to show my appreciation to the DSVs and crews.
● Tasked with setting up SBM on new drill projects
● Responsible for successfully drilling big-bore surface holes
● Responsible for successfully running and cementing 20-inch casing
● Responsible for successfully landing direction drilling trajectory is carried out to land 7” liner
● Responsible for successfully making up all Liner hangers and running liner through geological problem intervals
● Responsible for successfully Rig moves were carried out safely
● Responsible for successfully Settling all Omani Rig crews strikes – being the liaison between field and contractor management
● Played a key role with changes to BHA designs – improved flat time and improved BHA performance
● Responsible for successfully drilling the first pilot hole, cut and pulling 9 5/8 casing, set cement KOP and sidetrack
● Responsible for successfully gathering data info from DFG software and PWD tool to establish hole cleaning issues and ECD’s
● Responsible for successfully drilling Oxy’s first H2S well in Oman

August 2003 to January 2007
Shell Canada Drilling Supervisor

● Tasked with achieving day-to-day drilling operations.
● Achieved with orchestrating & managing to successfully D&C 2 exploration gas wells 4500 m directional 20 % H2S, $500 k underbudget each on each well
● Achieved with orchestrating & managing to successfully D&C underbalanced balance wells using foam methods
● Tasked with writing programs, managing & executing D&C 4500 m (15,000 ft) re-entry well – 12% H2S, $600k under budget, and 10 days under drilling curve
● Achieved with orchestrating & managing to successfully cut and retrieve cores (Full hole / Rathole)
● Achieved with orchestrating & managing to successfully conduct DST with 20% H2S this included flaring & sample catching using P-tanks and vessels

Skills
Big BoreComplexed completionsFishinghigh angel deviatedHorizontal wellsHPHTKPI'sMPDOffshoreOnshoreOpen hole and Cased hole loggingP&A'sSAPSlick LineSuperintendentSupervisor in DrillinWell InterventionWork-over's
Candidate Overview
Welcome to Drilling Consultants! We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies.

Sign in

Sign Up

Forgotten Password

Job Quick Search

Cart

Winkelwagen

Share